Home arrow Andrew's Blog arrow Coaster Dynamix® "Phoenix" Delayed
Coaster Dynamix® "Phoenix" Delayed PDF Print E-mail
Monday, 05 January 2009
The newest product from Coaster Dynamix®, the "Phoenix" has been delayed.

The newest and highly anticipated product release from Coaster Dynamix, the "Phoenix" roller coaster modeling system, originally scheduled for pre-holiday release, has been delayed. The "Phoenix, with the following features, is now scheduled for late February or early March release. We'll keep you posted. By the way, the computer simulation included with the Phoenix is beyond cool. We were and you will be totally blown away. Check back here or visit http://www.coasterdynamix.com/ for more details. CoasterDynamix_Phoenix1.jpg CoasterDynamix_Phoenix2.jpg

 

 

 

FEATURES:
• new modular design with molded track pieces keeps assembly time to a minimum
• highly detailed and durable train comes pre-assembled
• fully compatible with the flexible track system of our award winning Scorpion model
• optional expansion packs allow for infinite design possibilities
• operational station has a "passenger loading" feature for the train that includes the raising
  and lowering of shoulder restraints
• "dispatch" button allows manual control over the train function
• includes computer simulation software that allows the user to "ride" the coaster in any seat, view the ride from all angles, and get a real-time readout of G-forces and accelerations.
• operates on 4 AA batteries
• additional train styles available and sold separately

 

Comments
Add New Search
+/-
Write comment
Name:
Email:
 
Website:
Title:
 
:angry::0:confused::cheer:B):evil::silly::dry::lol::kiss::D:pinch:
:(:shock::X:side::):P:unsure::woohoo::huh::whistle:;):s
:!::?::idea::arrow:
 
Please input the anti-spam code that you can read in the image.
afitz  - Latest news on Phoenix   |SAdministrator |2009-05-21 11:31:12
avatar Delivery of Coaster Dynamix' highly anticipated Phoenix coaster modeling system
has now been pushed back to mid or late summer 2009. Sources at CD told MRCHQ
that this further delay was caused by a quality problem with one of the major
components and that this problem has now been corrected. Though I can hardly
wait to get my hands on Phoenix I also applaud CD for not releasing it until
it's totally ready. Way to go guys!
afitz  - Phoenix Delivery Date Announced!   |SAdministrator |2009-08-10 10:08:25
avatar Today, 8/10/09, Coaster Dynamix informed MRCHQ that the Phoenix is in route and
expected in their warehouse in about three weeks. Though sources at CD expect
the Phoenix to overwhelm sales of their classic Scorpion they have not announced
any plans to discontinue the popular Scorpion coaster modeling system.
afitz  - Phoenix has been shipped!   |SAdministrator |2009-09-17 12:27:25
avatar 09/17/09
Phoenix has been shipped and is expected in our warehouse tomorrow. It
will be featured in the Hot Products section of our home page as soon as it
hits. An MRCHQ Review will follow next week. Be sure and check it out.
afitz  - Phoenix is in stock!   |SAdministrator |2009-09-18 13:22:33
avatar 09/18/09
Phoenix is in our warehouse and under construction for review. Stay
tuned.

3.26 Copyright (C) 2008 Compojoom.com / Copyright (C) 2007 Alain Georgette / Copyright (C) 2006 Frantisek Hliva. All rights reserved."

 
< Prev   Next >